[SystemSafety] "Serious risks" in EC 765/2008
peter.sheppard at uk.transport.bombardier.com
peter.sheppard at uk.transport.bombardier.com
Mon Apr 8 14:24:10 CEST 2013
There is probably as much chance of finding a definition of "serious risk"
in the IEC standards as there is in defining what a "significant change"
is in the European Railway Authority, Common Safety Method!
Cheers
Peter
Peter Sheppard
Senior Safety Engineer and Validator
Mobile: +44 7920 247931
Please consider the environment before you print / Merci de penser à
l'environnement avant d'imprimer / Bitte denken Sie an die Umwelt bevor
Sie drucken
Bombardier Transportation UK Ltd
Registered Office: Litchurch Lane, Derby, DE24 8AD, England
TEL +44 1332 344666, FAX +44 1332 266271
Registered in England
Registration No. 2235994
<Thierry.Coq at dnv.com>
Sent by: systemsafety-bounces at techfak.uni-bielefeld.de
08/04/2013 11:03
To
<systemsafety at techfak.uni-bielefeld.de>
cc
Subject
[SystemSafety] "Serious risks" in EC 765/2008
Hi,
In EC 765/2008, what is considered a "serious risk"? Is there a reference?
How are the "serious risk" mitigations assessed, especially when "The
feasibility of obtaining higher levels of safety or the availability of
other products presenting a lesser degree of risk shall not constitute
grounds for considering that a product presents a serious risk."?
This standard also mandates that the product should be recalled when the
serious risk has materialized... and there is wording here to update the
risk assessment with field reports.
So is a "serious risk" in this standard in fact a materialized danger...?
Thanks for comments.
Best regards,
Thierry Coq
DNV
-----Original Message-----
From: systemsafety-bounces at techfak.uni-bielefeld.de
[mailto:systemsafety-bounces at techfak.uni-bielefeld.de] On Behalf Of Peter
Bernard Ladkin
Sent: 07 April 2013 10:46
To: systemsafety at techfak.uni-bielefeld.de
Subject: [SystemSafety] Solar Storms and Charging Procedures for Electric
Cars
Folks,
<cut>
I am running a group producing a risk analysis (in the sense of IEC Guide
51) of the charging process for electric road vehicles. There was and is
stiff resistance from some quarters. I have pointed out that, first, IEC
Guide 51 says that a risk assessment (compromising a risk analysis and
risk evaluation) should be required in any safety-related IEC standard.
Second that EC 765/2008 on product quality requires (Article 20) that
products representing a serious risk be withdrawn from European markets,
and that the judgment that products represent a serious risk be made
through a risk assessment. This is European law. Since I have pointed that
out in sufficiently general meetings, suggestions that the group's work is
pointless have all but disappeared (although the will to limit its work
has of course not, for this has other bases).
<cut>
Prof. Peter Bernard Ladkin, University of Bielefeld and Causalis Limited
_______________________________________________
The System Safety Mailing List
systemsafety at TechFak.Uni-Bielefeld.DE
**************************************************************************************
The contents of this e-mail message and any attachments are confidential
and are intended solely for the addressee. If you have received this
transmission in error, please immediately notify the sender by return
e-mail and delete this message and its attachments. Any unauthorized use,
copying or dissemination of this transmission is prohibited. Neither the
confidentiality nor the integrity of this message can be vouched for
following transmission on the Internet.
**************************************************************************************
_______________________________________________
The System Safety Mailing List
systemsafety at TechFak.Uni-Bielefeld.DE
_______________________________________________________________________________________________________________
This e-mail communication (and any attachment/s) may contain confidential
or privileged information and is intended only for the individual(s) or
entity named above and to others who have been specifically authorized to
receive it. If you are not the intended recipient, please do not read,
copy, use or disclose the contents of this communication to others. Please
notify the sender that you have received this e-mail in error by reply
e-mail, and delete the e-mail subsequently. Please note that in order to
protect the security of our information systems an AntiSPAM solution is in
use and will browse through incoming emails.
Thank you.
_________________________________________________________________________________________________________________
Ce message (ainsi que le(s) fichier(s)), transmis par courriel, peut
contenir des renseignements confidentiels ou protégés et est destiné à
l?usage exclusif du destinataire ci-dessus. Toute autre personne est, par
les présentes, avisée qu?il est strictement interdit de le diffuser, le
distribuer ou le reproduire. Si vous l?avez reçu par inadvertance,
veuillez nous en aviser et détruire ce message. Veuillez prendre note
qu'une solution antipollupostage (AntiSPAM) est utilisée afin d'assurer la
sécurité de nos systèmes d'information et qu'elle furètera les courriels
entrants.
Merci.
_________________________________________________________________________________________________________________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.techfak.uni-bielefeld.de/mailman/private/systemsafety/attachments/20130408/381087f8/attachment.html>
More information about the systemsafety
mailing list